INTER-CITY FIBER OPTICS INFRASTRUCTURE

Topaz constructs Inter-City Fiber Optic Infrastructures.
 
In 2010, with an agreement between Botaş and Superonline, a 260km Fiber Optic Infrastructural Project (Digging and Fiber) was realized  between the cities Ankara-Eskişehir-Bilecik in a very short time period of 2.5 months.
A 240km Fiber Optic Infrastructure Project between Adana-Gaziantep-Şanlıurfa has commenced in 2011.
 
 
Services held by Topaz concerning Fiber Optics Infrastructure Projects:
 
  1. PREPARING PROJECT PLANNING
    •  
    • Project plans, project management, project organization, excavation techniques, Craftsmen and Equipment planning and advanced controlling
    •  
    • Analysis of Investment and Operation costs, Feasibility (Project feasibility)
    •  
    • Critical dependencies and risk management
    •  
 
  1. MAPPING WORKS, MUNICIPAL LICENSES, PRIVATE PASSAGE  PERMISSIONS, ACQUIRING ASBUILT (Site Survey)
    •  
    • Excavation routes, Manhole placement plans, Fiber plans
    •  
    • Application project / Construction Plans
    •  
    • Private Passage permissions of correspondent establishments (TCK, DSI, IÖI, Forests i.E.)
    •  
    • Law related contracts concerning right of way
    •  
    • GIS (Geographical Information System) based As built and further Mapping
    •  
 
  1. EXCAVATION AND CONSTRUCTION WORKS
    •  
    • Conventional excavation and sealing in any width and depth
    •  
    • HDPE Pipes procurement and realization
    •  
    • Manhole procurement and realization
    •  
    • Bridge passing with galvanized pipes and other special passages
    •  
    • Horizontal drilling
    •  
 
  1. FIBER WORKS AND PLANNING
    •  
    • Fiber Core Plan and Topology Planning
    •  
    • Fiber laying and appendices
    •  
    • OTDR measurements
    •  
    • Fiber appendices box procurement and realization
    •  
 
  1. ACTIVE PASSIVE DEVICE SETUP AND SYSTEM ACTIVATION
    •  
    • Active Passive System Setup and Activation
    •  
    • Fiber Passive Device components Setup and Activation
    •  
    •  Active Device Setup and Activation
 
 

Either scripts and active content are not permitted to run or Adobe Flash Player version 10.0.45 or greater is not installed.

Get Adobe Flash Player
Çukurova Logo